Skip to main content
Zimei TechnologyEnterprise AI · Development and delivery
EnglishEN
Discuss a project

Home repair, installation and on-site service

Keep Every Service Request in One Work Order.

There is no need to chase people in the group for scheduling. The service personnel know what to do when they arrive; rescheduling, adding items, and expense confirmations remain on the original work order, and customers can also see the progress.

Work order WO-2026-0717Freezer drainage abnormality
guest
Store repair reportThere is water on the ground and a visit is required.
tune
Scheduling ordersCheck location, skills and time slots
serve
service staff13:30–14:00 Door-to-door
Customers see progressThe dispatcher knows who to callService staff know what to do

The same work order

One Work Order. Clear Views for Every Role.

Switching between the four states, the content seen by customers, dispatchers and service personnel will change together.
The same work orderWO-2026-0717

Current status:Accepting. Current owner:Help desk. Next step:Check the store, equipment and door-to-door requirements before arranging service personnel.

Customer appletdoor-to-door service
service order

WO-2026-0717

Accepting

Repair report received

Door-to-door location
South China Store A
Appointment time
13:30–14:00
need you nowIf there is still water on site, please isolate it first and take additional photos.

The service desk is verifying store, equipment and door-to-door requests.

Homeservice ordermine
Service dispatch deskSouth China Regional Service Group
Dispatcher
Work order details · WO-2026-0717

Check first, then send someone

Accepting
store
South China Store A
question
Freezer drainage abnormality
door-to-door
13:30–14:00
Scheduling is done nowConfirm service scope, equipment number and on-site safety instructions.

South China Store · Abnormal freezer drainage · Priority P2

Current owner
Help desk
Next step
Check the store, equipment and door-to-door requirements before arranging service personnel.
Service Staff AppToday's task
Task

WO-2026-0717

Accepting

No tasks received yet

service location
South China Store A
service level
P2
Do it nowThere is no need to contact the customer in advance.

After scheduling confirms the service scope, the task will appear here.

TaskCurrent work orderrecord
Self-built interface uses independently constructed non-customer work orders, not screenshots of customer projects. The four buttons only switch the page status and will not create real work orders or trigger dispatch, payment, or messages; the real roles, fields, and interfaces are confirmed in the project.

When there are changes in the scene

Give Every Change and Exception a Next Step.

The customer knows what to wait for, the dispatcher knows who will take over, and the service staff will not continue to work based on a remark.
Exception work orderCurrent processingowner

Customer Requests a New Time

The dispatcher gives a new visit time, and the appointment is updated after the customer confirms it.

Scheduling processing · Customer confirmation

On-site projects to be added

Send the new items and fees to the owner and confirm before continuing.

Initiated by service personnel·Confirmed by the owner

Not all materials are brought

Note down the missing materials and next arrangements, and keep this work order pending.

Service personnel records · Scheduling renewal

The customer disputes the results

The after-sales service will take over the processing, and on-site records and communication will remain on the original work order.

Service Owner Takes Over

Why look for Zimei Technology

A Working Dispatch System, Not a Flowchart.

Starting from the existing service rules, personnel arrangements and work order information, make sure that all three ends are available, and then verify each item with real work orders.

Existing information

  • Service scope
  • Personnel shifts
  • Fee method
Work order systemOne work order · three roles
CustomerSchedulingservice
  1. accept
  2. dispatch order
  3. door-to-door
  4. Confirm
  5. Completed

Real work order verification

  • Normal performance
  • Rescheduling & Shortages
  • Add-ons and fees
  • Controversy and reopening
  1. 01

    Keep existing rules

    Service scope, personnel shifts, fee methods and existing work orders can all be entered directly as projects.

  2. 02

    Three ends made into a set

    Customers, dispatchers, and service personnel share the same work order and do not need to relay it repeatedly.

  3. 03

    Deliver key points

    Rescheduling, additional items, costs and completion will be confirmed by the corresponding owner, and the process will remain on the original work order.

  4. 04

    Check with real work orders

    Normal contract performance, rescheduling, material shortage, additional items and disputes are all checked one by one using desensitized project work orders.

Next step

Send us your existing work orders and dispatch rules.

We will look at the service type, staffing arrangements, fee confirmation and existing systems, and then respond with the scope, quotation and schedule for the first stage.
Discuss a project