Business System Development
Replace Scattered Handoffs with One Working System.
Suitable for internal work such as approval, orders, projects, inventory, after-sales, production, and operations. We first understand how the business happens, who is handling it, and where errors are likely to occur, and then we complete product design, development, launch, and handover.How to do business analysis
Map the People, Information, and Decisions in One Real Workflow.
It’s not about making a list of features first, nor is it about moving existing forms to the web page as they are. The owner will go to the site with the actual users to find out where the system really needs to be connected.Who has this happened to?
Who initiates, who takes over, who confirms, and who only needs to view.
Where is the information now?
Which information should continue to be used in forms, chats, slips and old systems.
How to move forward at work
Under what circumstances can it be continued, and under what circumstances must it be returned or handed over to someone for processing.
How do I finish it?
Where does a business end? What should be checked and counted after that?
How to make a formal system
Build Pages, Rules, and Data Around One Clear Workflow.
Each step has results that can be directly checked. Users do not have to wait until the system is completely written to see for the first time whether the product meets work habits.Let’s first see what the system will look like
Draw the job home page, business documents, and key operations into clickable prototypes so that actual users can walk through them first.
Page and operation confirmationTurn the confirmed process into a product
Complete the front and backend, account permissions, business rules, data structures, and agreed old system or third-party interfaces.
Runnable versionTest it with actual work
Use real business to handle normal, returned, missing data and abnormal situations, and change them so that users can complete the work.
Test and handover recordsAn in-house business workflow demo
See One Parts Request Move Through the System.
- ✓Maintenance Submission ApplicationChen Hao · August 13, 09:18
- ✓Approved by the production departmentZhao Min · August 13, 10:06
- 3Warehouse registration actual releaseLin Wei · Current Processing
- 4Maintenance personnel confirm receiptWaiting for warehouse submission
Go live and deliver
Receive the System, Business Rules, and Handover Materials.
We complete the front and backend, permissions, data and agreed interfaces, and deploy them to the target environment. After real people complete the agreed scenario, the source code, configuration, test records and usage instructions are handed over with the project.Why look for Zimei Technology
We Deliver a Working Product—not a Set of Screens.
- 01
Design after understanding the business
Don’t use generic templates to guess your needs. The owner will clarify the roles, rules and exceptions based on the real business.
- 02
Design and development come together
Products, front-end and back-end, permissions, interfaces and deployment are promoted by the same team, and issues are not lost between different vendors.
- 03
Acceptance based on real work
It doesn't mean it's completed when the page can be opened; the actual personnel can complete the work, the results can be checked, and the person taking over can continue the maintenance.
Existing business system construction plan