Skip to main content
Zimei TechnologyEnterprise AI · Development and delivery
EnglishEN
Discuss a project

Document Review

Catch Contract Inconsistencies Before They Slip Through.

There are two types of payment times, the application amount does not match, and the warranty lacks the starting date - it is very slow to search page by page manually, and it is easy to miss. We marked these issues together, retained the original text, and handed it over to the owner for review.

Equipment purchase contract1 difference found
Text · Article 6.2

After passing the acceptance 10 working daysPayment within

Appendix 2·Business Conditions Form

After the equipment arrives 5 working daysPayment within

Payment times are inconsistentSend to Procurement and Legal

How to handle a contract

Find Discrepancies. Route Them to the Right Reviewer.

There is no need to memorize the concept, just see how the payment time here goes from the original text to the contract ledger.

01 Original contract

02 Procurement and legal confirmation

Payment times are inconsistentTo be confirmedConfirmed
Text
10 working days
Accessories
5 working days

Use text conventions

03 Back to business process

Contract ledger
payment time10 working days
ConfirmorProcurement manager, legal affairs
updated
  1. Find out the problemCompare Both Clauses
  2. Leave it to the right personOwner Checks the Source
  3. Keep the ResultExport or bring back an existing system
If there is any conflict, submit it to someone for confirmation; the confirmed results can be exported or linked back to the existing system by project.

How to use it in practice

Open a Discrepancy and See Who Should Review It.

Click on the payment node, contract subject or warranty conditions, and the original text and owner will change together.
Contract reviewPending files
current taskTwo places are inconsistent

Documents received

Select a document

Current documentation:purchase contract. Viewing:payment node. Original location:Page 5 · Article 6.2; Page 11 · Attachment 2 "Business Conditions Form". Status:Two places are inconsistent. Next step:Confirm whether to use the main text or attachments

Original text

Equipment purchase contract

12 pages · Main text and 3 attachments
HT-2026-041Equipment purchase contractV1.3 · Pending version
Page 5 · Article 6.2
The buyer shall pay the payment for this batch within 10 working days after the equipment arrives and is accepted.
Source Passage
Page 11 · Attachment 2 "Business Conditions Form"
Payment time: Within 5 working days after the device arrives.
Source Passage
Field basis·You can return to the original text for verificationHT-2026-041

Question list

Two places are inconsistent

3 key fields in total
Viewing

payment node

Two places are inconsistent
How it’s written in the document10 working days for main text / 5 working days for attachments
  • Page 5 · Article 6.2
  • Page 11 · Attachment 2 "Business Conditions Form"

Other default documents

Static snippets are retained when JavaScript is turned off.

  • Purchase requisition formApplication amount: To be confirmed;Original text location:Page 1 · Application amount; Page 2 · Cost Details.
  • business reportAbnormal matters: Two places are inconsistent;Original text location:Page 2 · Executive Summary; Page 6 · Exception details.
Self-built interface and non-customer samples

Only the default content is switched here, no files are uploaded, saved, exported or written back; the actual fields, data usage rights, permissions and interfaces are confirmed in the project.

Why look for Zimei Technology

A Knowledge Workflow, Not Just Chat.

From fields, original text positioning, manual confirmation to export or system access, we create a usable process together.

Project input

  • FieldPayment time, subject, amount
  • judgeConflicts Require Review
  • positionProcurement manager, legal affairs
Document reviewConfiguration by project

Payment times are inconsistent

Need to be processed
Confirm whether to use the main text or attachments
owner
Procurement manager, legal affairs
Click to return to the original text

Delivery destination

Contract ledgerPayment time has been updated
OATo-do and responsible person
FileExport in agreed format
Real sample acceptanceRecord field by field, not just look at the demo effect
CorrectMissed mentionmentioned by mistakeUnable to judge
  1. 01

    Not just recognition

    Defects, conflicts and exceptions are listed separately. Clicking can return to the original text, and the owner can review it directly.

  2. 02

    Depends on your business

    First use a type of high-frequency document and implement it according to your field list, judgment criteria and job division.

  3. 03

    Take back the existing process

    The confirmation results are exported according to the agreed format; if necessary, OA, contract ledger or other existing systems can be connected.

  4. 04

    Test with real samples

    Use authorized and desensitized formal project samples to record correctness, omission, mismention and inability to judge field by field, and then check the interface reception results.

It shows how to make the project data reviewable, accessible, and item-by-item acceptable in the first stage; the specific fields, systems, and sample scopes are confirmed in the project.

Next step

A Few Representative Samples Are Enough.

Contact the project leader and send us the existing contract or business documents. After reviewing the sample, we will respond with a scope, quote and schedule for the first phase. Project information and communication content will be kept strictly confidential.
Discuss a project